ESD Carpet Tiles for Static Control |
|||
| Electronic
Assembly, Raised Flooring,
Networked Offices, Control
Towers, Command Centers and
Labs Before you go any further remember: An ESD floor isn't installed like standard flooring. At Ground Zero we "do" ESD flooring installs. Any ESD flooring material, thousands of successful installs, great references PLUS certification to the latest EOS ESD guidelines! Product Overview, Installation Recommendations and Compatible Adhesives ZeroStat ESD control carpet tiles provide a electrically conductive pathway from a person to ground allowing static electricity to be discharged without harming sensitive electronics. In high tech environments (such as networked offices and control towers) static can devastate electronics' causing a variety of "glitches" and blown components required for critical applications. Static control is of such importance in electronic assembly environments, that technicians routinely wear static control shoes or foot grounding devices (in combination with the installed flooring) to provide intimate skin to floor contact and the ultimate in static protection. ZeroStat Carpet Tiles are Engineered to also control the electrostatic charge generation of rolling equipment such as carts, chairs, test equipment and transport means of subassemblies or completed product. |
ESD,
Anti Static And ESD Carpet, Tile,
Mats, and Floors
ZeroStat Carpet XO-Stat Carpet AZO Stat Carpet ZeroStat Tile EuroStat Tile UniStat Vinyl Tile PolyStat Sheet Vinyl Durostat ESD Tiles UltraStat ESD Control Tile Epoxy Floors Floor Matting |
||
At
Ground Zero we have a variety
of ESD
flooring materials,
however ESD Carpet tiles provide
a crisp modular look, can be
removed and replaced (when stained
or worn)
and can be fitted around equipment
easier than our X-O
Stat ESD Broadloom.
In actuality a well installed
UP Carpet Tile ESD Floor is
superior over many vinyl's
and epoxy type floors at eliminating
static. When installing remember:
Static
control flooring is an integral
component of the clients production
reliability, thus the proper
installation is important!
Utilizing conductive filaments
interwoven with a 100% solution
dyed nylon
and tufted, dense pattern textured
loop, this ESD carpeting provides
the utmost in overall performance.
Unlike typical "low
kV" (standard
anti-static carpeting) our conductive filaments are inserted in
each yarn end of the basic raw broadloom. This superior manufacturing
technology provides a carpeting than never requires chemical anti-stat
treatments yet provides exceedingly consistent electrical conductivity
across the entire surface of the material. Make sure that the sub-floor and site conditions meet your requirements! The installation of ZeroStat carpet tiles shouldn't begin until the work of all other trades (especially overhead trades) has been completed. The installation areas must be clean, fully enclosed, weather-tight and have the permanent HVAC system set at a minimum of 68o F (20o C) for a minimum of 72 hours prior to, during and after installation. The ZeroStat Carpet Tiles must be delivered to the installation area and allowed to acclimatize in the same manner. To allow for proper inspection of the substrate, installation of the flooring and final inspection of the install all areas to receive flooring must be adequately lighted. Wood floors should be of double construction with a minimum thickness of 1 inch. The wood floor must be rigid, free from movement and have at least 18" of well ventilated air space below. Typically, ZeroStat carpet tiles shouldn't be installed over wooden sub-floors built on sleepers over, on or below grade concrete floors without special considerations. Contact us if such a install is required. Our recommended adhesives bond to a variety of substrates! The subfloor to receive the flooring should be smooth, flat, level, permanently dry, clean and free of all foreign material such as dust, paint, grease, oils, solvents, curing and hardening compounds, sealers, asphalt and old adhesive residue. The concrete must have a minimum compressive strength of 3500 psi. Patch and repair minor cracks and other imperfections with a Portland-base patching compounds. Do not install floor coverings over gypsum-based leveling or patching compounds. It is essential that calcium chloride moisture tests be taken on all concrete floors regardless of the age or grade level. One test should be conducted for every 1000 sq. ft. of flooring (minimum of 3). The test should be conducted around the perimeter of the room, at columns and where moisture may be evident. The moisture emission from the concrete must not exceed 5.0 lbs per 1000 sq'ft. in 24 hours (for our conductive liquid adhesive) and 3.5 lbs per 1000 sq/ft for our textile reinforced releasable adhesive system. A diagram of the area showing the location and results of each test should be submitted to the Architect, General Contractor or End User. If the test results exceed the limitations, the installation must not proceed until the problem has been corrected. Insure that the received materials meet your criteria! Prior to installation of this product insure that all floor covering
materials and adhesive have arrived on site, that the dye lots,
and part numbers match the clients order and that the materials
have arrived in undamaged condition. Don't forget; allow the materials
to time acclimatize to the temperature controlled environment of
the installation area for at least 72 hours prior to beginning
the install. |
|||
|
|||
Installation Layout is
similar to a vinyl or VCT tile install. Installation generally
starts in the
middle of the area and works it's way out from a carefully placed
+ pattern with edge of carpet tiles being meticulously placed along
chalk lines. Keep in mind, our carpet tiles are DIRECTIONAL and
well marked with a arrow on the back of each tile. These arrows
MUST all point in the same direction!Our Adhesives bond to the impossible! Curing just takes a little longer! As mentioned earlier we have two types of conductive adhesives recommended for use with ZeroStat Carpet Tiles. Both adhesives are designed to provide a "equiplane of conductivity" between the insulative substrate and the conductive carpeting. Chances are that your client has previously picked the adhesive when ordering the flooring material. When quoting install cost it's always best to ask about their selection. Following are the advantages and specific nuances of each: |
|||
1) US
2000 Releasable Adhesive is a textile reinforced, double stick "tape." Available in conductive and standard.
Perfect for installing floors in leased facilities (when you
move the floor goes with you). Excellent choice for asbestos
laden substrates, raised computer floors and fast track usage
(requires no curing time to achieve bond). This material is supplied
in a 39" x 86' rolls. Designed to cover a variety of surfaces
including existing well bonded VCT, Linoleum, Cement, Steel,
Hardwood, virtually any surface that is smooth, dust and oil
free, well bonded and meets the moisture emission requirements
of being below 3.5 lbs per 1000 sf (calcium chloride test). Easy
to use, clean, odor free and FAST (saves about 25% in labor over
troweled on liquid adhesive). 2) GZ-C2000 Conductive Liquid is a permanent, solvent free, water based, one part conductive adhesive system designed specifically for use with our conductive flooring materials. When properly applied this adhesive has excellent seam strength, and does not require additional seaming adhesive. GZ-C2000 is designed for use on, above or below grade, on unsealed concrete, VCT, Vinyl's, Steel, Mahogany and "sturdy floor type" subflooring (our latex based conductive primer is typically required for non-absorptive substrates). GZ-C2000's Advanced Polymeric Acrylic features the highest conductive filler to bond strength ratio and tolerance to cement moisture emissions in the industry: Warranted to 5.0 lbs per 1000 sf (calcium chloride test). GZ-C2000 Conductive Liquid Application: Apply using a 1/16" x 1/16" square notched trowel. Allow adhesive to slightly tack, observe carpet lay direction (arrow on vinyl backing), place tiles on adhesive surface (starting at inside corner and carefully sliding into place). After 4 hours, carpet tiles may be rolled using a light weight(<51#) vinyl tile roller. Prior to rolling large area look for adhesive oozing between seams and possibly onto carpet, discontinue rolling for 8 more hours if evident). To avoid shifting of tiles do not allow equipment or other heavy loads to utilize floor for: 72 hours (cement) and 96 hours (primed non absorptive substrates). Clean up trowels and hands with warm soapy water. If adhesive gets on carpeting clean immediately with warm water blotting dry with dry clean towel. GZ-C2000 FEATURES:
|
|||